"Lasting Partnerships"
We hold a very effective
drawing office, and we work closely with project architects and engineers,
minimising drawing time as at the early stages of project development,
communication is key.
Example of projects. The first project for Bovis Lend Lease was a development at Mincing Lane London called Plantation 2, the major part of the architectural package, was the installation of a Woven S/Steel Mesh Screen within the reception foyer. This was a very demanding feat, but the results were outstanding.
Another testing project was
the cladding of a 24 storey concrete frame. This work was carried out on
behalf of Laing O’Rourke at there Express Wharf development.
At Stanstead Airport Skanska built a Radisson Hotel adjacent to the main terminal and we were subcontracted to install the internal balustrade to all the access stairs, an external terrace and a covered walkway from the Hotel to the main terminal.
At Lombard road in Battersea
we were subcontracted by Barretts West London, to install external polyester
powder coated balcony, and terrace rails. This required the prefitting of a
proprietary bracket that was
More recently we have been
involved with the fabrication of a modular housing design, this was
fabricated in heavy duty RHS, that could be linked together via cast
container corner blocks. The fabrication tolerances were within +- 2mm. The
frames followed a very tight QA procedure.
Kimber Engineering produce a
variety of Architectural and structural items, and as you can see from our
portfolio the vast arrange of complex projects we undertake.
Kimber Engineering once
involved in a project, has the ability to drive its section, we pride
ourselves in having the ability to stay ahead of programme.
We can drive contract values
up to 1 million pounds, by ensuring the design element is driven in
co-ordination with the Architect,
We form a good working
relationship with main contractors, which in turn have allowed us to become
involved, at tender
|
© Kimber Engineering 2005 |